Sustainability is everything

Net Zero

  • By 2030, Rock Tech aims to reduce scope 1 and 2 emissions at the Guben converter by at least 50% compared to the 2023 LCA base case of 4.34 t CO2/t LHM. As an aspirational target, Rock Tech aims to reduce scope 1 and 2 emissions in Guben to zero by 2030.
  • By 2030, Rock Tech aims for a 15% reduction of scope 3 emissions at the Guben converter compared to the 2023 LCA base case of 6.2 t CO2/t LHM. As an aspirational target, Rock Tech aims to reduce scope 3 emissions from Guben by 40 % by 2030.
  • Rock Tech estimates scope 1 and 2 emissions at its Georgia Lake to be 0.5 t CO2/t SC6. Rock Tech aims to improve its respective carbon footprint from this baseline. The aspirational target is a reduction of 60%.

Lorem ipsum
dolar sit amen
consetetur

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat.

Circular Economy

  • By 2030, Rock Tech aims for at least 90% utilization of its non-lithium products produced in Guben.
  • By 2030, Rock Tech aims to produce up to 50% of its battery grade lithium products from recycled feedstock.
  • Rock Tech strives to minimize its impact on water resources in the regions we conduct our mining operations. Within 2 years of commercial production, Rock Tech aims to meet Level A or higher of Towards Sustainable Mining (TSM)’s Water Stewardship Protocol.

Responsible Organization

  • Rock Tech is an equal opportunity employer, and all job applicants are considered for employment. By 2030, Rock Tech aims to increase its female workforce to 40%, leadership positions to 40%, and board members to 50%.
  • Rock Tech is committed to fostering a generative health and safety culture with the goal of achieving zero harm.
  • By 2025, Rock Tech aims for corporate sustainability disclosure in alignment with TCFD recommendations, and to adopt all mandatory sustainability disclosure Frameworks.
  • Rock Tech proactively supports the battery passport transparency requirements for lithium mining & refining in alignment with the new EU Battery Directive and aims for full compliance within 1 year of commercial production in Guben.