Rock Tech has announced positive assay results of a summer exploration program that identified three new spodumene-pegmatite prospects. Theprogram was completed between July and September of 2022 and included prospecting and mapping of spodumene-bearing pegmatites in areas both proximal to known deposits and in under-explored areas at Rock Tech’s property.
Three new prospects were identified based on assay results of samples collected from several areas. Further trenching and drilling will be used to more precisely determine the dimensions of the spodumene-pegmatites, however the current minimum interpreted strike-extent ranges from 100 metres to 500 meters. Rock Tech plans to conduct a trenching program in the summer of 2023 to follow-up on the positive assay results.
„Rock Tech is pleased with the results of the summer exploration program and we are encouraged with the ongoing potential of the Georgia Lake Project. Rock Tech is currently planning our 2023 exploration program to follow up on these encouraging results.”
Robert MacDonald, General Manager of the Georgia Lake Project, commenting on the results of the 2022 summer exploration program.
More details can be read in the official announcement in the press section on this website.