Georgia Lake Project
Rock Tech Lithium owns 100% of the Georgia Lake Project.
It is a Lithium hard-rock deposit that is strategically positioned
within the Thunder Bay Mining District of Ontario, Canada, approximately 160km north of Thunder Bay.
Situated 16km south of Beardmore and 66km north of Nipigon,
with convenient access from the Nama Creek access road off the TransCanada Highway 11.
Pre-Feasibility Study
In November 2022, a Prefeasibility Study was completed on the project.
Highlights of the study are:
- Estimated pre-tax net present value at 8% discount rate („NPV“) of USD 223 million at an average life of mine („LOM“) price of USD 1,500/t, 6% spodumene concentrate („SC6“).
- Estimated pre-tax internal rate of return („IRR“) of 47.8% at an average LOM price of USD 1,500/t, SC6.
- LOM of 9 years, with low-cost open pit mining for the first 4 years and underground mining for the last 5 years.
- Pre-tax payback of 2.9 years.
- Total Indicated Mineral Resources of 10.6mt at grading 0.88% Li2O and total Inferred Mineral Resources of 4.2mt at grading of 1.00% Li2O.
- Declaration of Mineral Reserves: Total Probable Mineral Reserves of 7.33mt at grading of 0.82% Li2O.
- Pre-production costs estimated at USD 192.2 million and sustaining capital costs of USD 98.5 million (including closure costs).
- Average annual spodumene concentrate production of approximately 100,000 t of SC6.
- Total LOM average cash costs of USD 719/t concentrate.